Wednesday 25 May 2011

Elevator Terminology

As professionals in the elevator industry we often speak using the industry "lingo" The following is an explanation of some of the common terms you will find in quotations, drawings, and design guides:


Pit - This is the recess in the floor at the bottom level of an elevators travel. This is required so that when the elevator lands, the car or platform base can land level with the lower landing floor. Pit depths are usually 3" , 6" , 8", 12" or 14". There are some devices on the market that advertise "no pit required ". If a pit is not utilized you will be required to ramp up to the platform or in some cases the elevator has a thin base that lands directly on the floor. These units typically utilize a 3" pit. if you want to avoid the ramp.

Hoistway or Shaftway - The enclosure around the elevator consisting of one load bearing wall (sometimes referred to as the Rail Wall) and a landing entrance for each stop. This structure can be constructed using wood studs and drywall.

Standard Door

2 Speed sliding door
Landing entrance - A door wired into the elevators' safety circuit to prevent access to the hoistway. This safety feature will also prevent the elevator from moving if the landing entrance is not closed. A landing entrance could be a standard household door (with an interlock), or a two speed sliding elevator door supplied by the elevator manufacturer.



Travel - the total distance from the bottom floor to the upper most floor that the elevator will be accessing

Overhead - The amount of space required from the top floor to the nearest ceiling obstruction. Most residential elevators only need 8' overhead so a standard 8' ceiling is adequate

Machine Room - Some elevators and accessibility lifts require a small machine room. This room would typically be about 2 ' deep x 3' wide. According to the electrical code you must be able to have clear access 1 meter in front of the electrical controller and disconnect.

Car or platform configuration - Elevators can be ordered with 1,2 or 3 openings (depending on the model). It is conceivable that on a 3 stop elevator you could enter from the north on the first level, exit from the east on the 2nd level and then exit from the south on the third level.

Car gate



Through car or platform (Type II) - This design would have 2 openings directly across from each other (enter/exit opposite sides)

90 degree car or platform (Type III or IV) - This design allows for the user to enter from the front, then turn right or left at the next landing. If this configuration is chosen, make sure you select a large enough platform.

Car gate - This is the device travels with the elevator to ensure that you cannot come into contact with the hoistway.

Car door - Rather than a car gate a two speed sliding elevator door can be selected to travel with the car. This gives the appearance of a passenger elevator like you may see in public applications.

Light Screen - This is another means of ensuring that the passenger of the elevator remains safe while the device is operating. An invisible beam shoots across the open side(s) of the car. If the light beam is broken the elevator stops.






COP (Car Operating Panel) - This is the panel located on one of the walls of  your elevator that will have the various floor selections and emergency stop buttons. Some COP's also contain a phone cabinet or a hands free phone built right into them.

For more information on residential elevators please visit Medichair


 





11 comments:

  1. Home Elevators offering greater mobility and accessibility to those with physical disabilities.When deciding on an elevator in your home one of the most important factors in your decision should a Good Company for buying Home Lifts and Aritco offers the home lifts with great comfort, satisfaction and beauty it will increases the value of your home.

    ReplyDelete
  2. Good information regarding elevators and this is a must thing in residential and commercial locomotion.

    Home Lift Systems

    ReplyDelete
  3. My mother loves her home three story home, but it is getting so hard for her to walk up and down the stairs. We have considered moving her into a smaller place, but she refuses. We're just afraid she'll fall down and get hurt. We are highly considering putting in an elevator for her. This information is so helpful, because I hardly knew anything about the mechanics of elevators.
    Edmond Vandergraff | http://www.transitionsmobility.com

    ReplyDelete
  4. You have given information about home lift. It was a great experience reading your blog. Such blogs should be appreciated and shared. Thanks for sharing, keep blogging.

    ReplyDelete
  5. Extradinary Blog. Thanks for sharing this wonderful blog. Elite Elevators is one of the best home elevators company in Australia. We offers
    Home elevators | Commercial elevators | Hydraulic Elevators throughout Australia.

    ReplyDelete
  6. Nice Blog. Thanks for sharing. Nibav lifts offers best vacuum lifts across the India. Get More information Click Here
    Vacuum elevators | pneumatic lifts

    ReplyDelete
  7. Very interesting and thanks for sharing such a good blog. Your article is so convincing that I never stop myself to say something about it. You’re doing a great job. Keep it up. I have shared You Our Cheap Home Lifts in Malaysia consume less energy than a home appliance, require 90% less maintenance than its alternatives, and only need a small space to be installed. Read our Site :Vacuum Home Lifts

    ReplyDelete
  8. This comment has been removed by the author.

    ReplyDelete
  9. With practice, a candid wedding photographer can master the art of anticipating moments. Pre-visualize the scene to construct compositions that convey a story. To Know more for the Wedding photography costs in Tirunelveli

    ReplyDelete
  10. Nibav vacuum elevators innovative design is ideal for any retrofit or new construction project, increasing the value of one’s home without the consuming footprint of a typical home elevator. Nibav’s unique home elevator does not require any pre-construction shaft, pit, or machine room and can be constructed and operational in 48 hours. The unit seamlessly glides between levels while using significantly less energy than other home lifts.

    ReplyDelete